The race to secure the church and give it basic weather protection had been sucessfull.

Kingspan  OSB sheets now installed 

Works now move inside to get ready for the delivery of the servery. First job is to dig out for the Servery floor slab

Servery floor preparation 

The insulated servery floor is laid

Hardcore insulation and concrete 

The rest of the floor area is prepared.

Ready for floor boards