The only plant used in the project was on the 1 day when Jim kindly dug out the footings with his mini-digger and loaned us his dumper to cart the soil to the carpark.

Ready for the concrete 

 Now the site is prepared - construction begins with the mixing and pouring of the footings.

Construction begins 

 We constructed the foundations out of poured concrete, trench blocks and brickwork.

 Ready for the water pipe and the wall framework